To reduce this risk of failure and losing money, potential producers should go through the different aspects of running their business in discussions with friends and advisers before they commit funds or try to obtain a loan. This process is known as doing a feasibility study and when the results are written down, the document is known as a business plan.
The basic engineering package (BEP) provides necessary information to integrate new units into an existing process. The simple basis for a basic engineering project is developed in the preceding conceptual design work. The separation process is examined, making use of the available know-how both in-house or on your side, data from data banks, and pilot tests.
FEED (Front End Engineering Design) means Basic Engineering which is conducted after completion of Conceptual Design or Feasibility Study. At this stage, before start of EPC (Engineering, Procurement and Construction), various studies take place to figure out technical issues and estimate rough investment cost.
Finding new profits calls for new ways of looking at a business.
To familiarize the engineers with the energy efficiency opportunities available in the various electrical equipments and to help them to prepare better for the BEE certified Energy Manger Exam.
Programs typically include inspections, evaluations, monitoring and mitigation strategies to protect people, the environment and the integrity of assets. The Asset Integrity Manager is a senior leader and typically comes from an engineering background with years of experience in oil and gas operations.
Renewable energy engineers are problem-solvers who use the principles of mathematics and science to perform a variety of tasks in the renewable energy industry such as research and designing wind turbines, geothermal plants, and solar photovoltaic cells.
Zero liquid discharge (ZLD) is a strategic wastewater management system that ensures that there will be no discharge of industrial wastewater into the environment. It is achieved by treating wastewater through recycling and then recovery and reuse for industrial purpose.
Quality Assurance, often abbreviated as QA, is essentially a quality management process that maintains the desired level of service/product quality by paying strict attention to each stage of production, distribution, and consumption. This process, fundamentally, aims to sustain production consistency, advance work efficiency, and boost customer confidence – both internally and externally.
The main focus of Total quality management is to maintain existing quality standards whereas Six Sigma primarily focuses on making small necessary changes in the processes and systems to ensure high quality. The process of Total quality management does reach to a saturation level after a certain period of time.
Troubleshooting is a form of problem solving, often applied to repair failed products or processes on a machine or a system. It is a logical, systematic search for the source of a problem in order to solve it, and make the product or process operational again. Troubleshooting is needed to identify the symptoms.
Risk based inspection is the process of developing a scheme of inspection based on knowledge of the risk of failure. The essential process is a risk analysis. This is the combination of an assessment of the likelihood (probability) of failure due to flaws damage, deterioration or degradation with an assessment of the consequences of such failure.
deliver the full engineering, procurement, and construction (EPC) solution for your gas engine or diesel power generation project from a single point of delivery.
Mentoring seeks to build wisdom – the ability to apply skills, knowledge and experience to new situations and processes. Coaching - The focus is on meeting very specific objectives within a set period of time. Coaching is mainly concerned with performance and the development of certain skills.